Urumqi Ring Expressway (East Line) Project (2011-2014, 6.88 billion)
Project Name: Urumqi Ring Expressway Expressway (East Line) Progress of the Project: Environmental Impact Assessment Construction Period: First quarter of 2011 - Fourth quarter of 2014 Major equipment: excavators, bulldozers, cranes, road rollers, tamping machines, mixing towers, Paver, protective panel, explosion-proof blanket, non-magnetic probe, inspection well, explosive tool vest, police equipment, bayonet, intelligent transportation, electronic police, arrest system, radar speed, green facilities, fire-fighting facilities, lighting Facilities, drainage facilities, safety facilities

Project Description:
The project is located in Ganquanbao Industrial Park, then connected to the Tuwu Expressway (interchange section of Ganquanbao). It passes through Urumqi East and ends at Xishan Road. The total length of the route is approximately 81.845KM. It is an important part of the expressway around the city of Urumqi. Among them, about 63.045KM from the starting point to the Ulapozong Interchange, and about 18.8KM from the Ulaho Interchange to the Xishan Road Interchange, the existing road will be rebuilt and expanded. The proposed project includes the main line and the intercommunication section. The entire line adopts the six-lane highway standard construction (planned by eight lanes). The subgrade has a width of 33.5M, and the gap between the Ganquanbao Interchange and the Ulapozong Interchange section is approximately 63.045KM. The main project includes large projects. There are 3 bridges, 14 Dazhong Bridges, 139 culverts, 8 interchanges, 6 separated interchanges, 18 tunnels, and 11 tunnels. Ulaho Interchange to 18.8km of Interchange Section of Xishan Road The existing Wuquet Highway will be rebuilt and expanded, and two interchanges will be established. The main control points along the route are the Shirenzi of the Tuowu Highway Ganquanbao Interchange, the Tuowu Highway Ulabo Interchange, Shirengou and Tiechanggou Tiechanggou Town’s Shuguang Shangcun, Tiechanggou Xicun, and Urumqi Shuimogou District’s Shirenzi Gou Village, Gejiagou Village and Ula Bo community in Tianshan District, Urumqi. The project covers an area of ​​5,503 acres, 54.78 acres lower, 3107.02 acres of wasteland, 88 acres of industrial and mining land, 2049.08 acres of grassland, and 84.4 acres of homestead.


The total investment of the project is 6.88 billion yuan.

Construction Unit: Xinjiang Uygur Autonomous Region Transportation Construction Administration Postal address: 52 Yan'an Road, Urumqi, Xinjiang Zip Code: 811010
Contact: Satellite phone

Design institute: Xinjiang Uygur Autonomous Region Environmental Protection Technical Consultation Center (EIA)
Postal address: No. 774 Beijing South Road, Urumqi Zip Code: 830011
Contact: Zhang Jianfei Telephone Fax

Related Developments: Tower Crane Infrastructure Project

Double Girder Overhead Crane Kit With Hoist

Crane kits is now popular all over the world due to the sharply increased shipping costs.Whatever Overhead Crane , Gantry Crane or Suspension Crane,you can find Crane Kit in Eurocrane. Crane kit means all components except steel structure,you can also choose freely. Crane kits are supplied with hoisting unit,there are various type of hoisting unit,like low headroom rope Hoist ,Double Girder Hoist and etc.);end carriages (with connection plates); cable festoon system; control panel and pendant.

Double Girder Overhead Crane,Overhead Travelling Crane,Overhead Bridge Crane,Double Girder EOT Crane,Overhead Crane

EUROCRANE GLOBAL , https://www.euroopenwinch.com