Project Name: The Progress of the Construction Project of Bofu Plaza: Construction Under Construction Period: 2010.7-2013.8
Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities and lighting facilities.
Project Description:
The project is located west of Furong Road in Changsha, and north of Xiangchun Road, with a total construction area of ​​284,613 square meters. It consists of a 43-storey commercial apartment building, a 49-storey integrated office building, and two- to four-storey skirts. The building has four basements.
The total investment of the project is 300 million yuan
Construction Unit: Hunan Yu Ding Real Estate Development Co., Ltd. Contact: Yan Xiaobo Telephone Fax
Design Unit: Shenzhen Design Institute Second Design Institute Contact: Luo Xing -1 Telephone Fax
Design Unit: Shenzhen Institute of Architectural Design and Design II Water Supply and Drainage Engineer: Xu Yujuan-1 Telephone Extension 811
fax
Paper industry has special environment, such as high temperature, high humidity and frequent loads, etc., thus the requirements for Overhead Crane is quite high.Accumulating years of industry experience and keeping innovation,Eurocrane has formed standardized industrial crane design criteria. The Double Girder Overhead Crane is adopted with customized lifting attachment, intelligent automatic system,special material and etc., well meeting the requirement of paper mill industry.
Industrial Crane,Industrial Crane for Paper Mill,Industrial Crane in Papermaking Industry
EUROCRANE GLOBAL , https://www.craneparts.pl