First, in accordance with the "Regulations on the Administration of Mineral Resources Exploitation Registration", the registration procedures have not been processed beyond the prescribed time limit; the second is that the mining rights are not set up properly, and it is not appropriate to apply for the renewal of registration; the third is the arrears, less payment, and compensation for the loss of mineral resources. fee, mine geological environment governance restoration margin and mining rights fees; Fourth, do not follow the development and utilization mining, cross-border mining, illegal mining rights transfer; Fifth, do not meet the mineral resource planning and national industrial policy; Sixth mining The recovery rate, the mining depletion rate, and the ore dressing recovery rate do not meet the specified requirements; the seventh is that the reserves are not verified to meet the minimum mining scale; the eighth is the safety hazard, which is still unqualified after the rectification within a time limit; Seriously damage the ecological environment, the masses have greater opinions; 10 is not fulfilling the task of land reclamation on time, or the quality of reclamation does not meet the requirements.
PET Series Injection Molding Machine
Pet Seriesinj Moulding Mach,Pe Bottle Plastic Molding Machine,Pet Bottle Injection Molding Machinery,Lab Pet Test Tube Producing Machine
Ningbo Jietan Machinery Equipment Trading Co., Ltd. , https://www.jietanmachine.com