For many of our friends, they want to learn the techniques of driving a crane in order to allow them to survive better in society. Choosing the technology of the crane will have a good economic guarantee for our future life. So how can we learn to crane quickly? The next Xiaobian will talk to you about related issues.

First of all, to operate a crane , it is necessary to first understand the performance of the crane, especially at what angle, under what length can lift multiple cargoes. Which goods cannot be dropped, and so on. The second is to master some of the relevant technical skills, this time have to ask some friends who will open the crane or some masters. Because they have experienced many years of crane driving, there will certainly be a lot of experience accumulated. At this time, asking them for advice can save them a lot of time. So what are some of the things we need to learn about driving cranes? Xiao Bian also summarized some for everyone.

3_副本1.jpg

When driving a crane , first adjust the view of the rearview mirror, and then observe whether there are some obstacles in the car and then design the route of driving. At the same time, we must also investigate the geology of the work to be performed on the spot. If it is on one side with a high side, we must be able to get a pad and keep the balance of the crane. Immediately after the start of the crane, we must pay attention to what kind of environment, what kind of work we have to do, grasp the extent of the dryness according to the actual situation, but also take into account the special nature of the goods transferred. If the goods are on the ground, the view is good and the environment is not too long at this time. If you are going to work at heights, you must have a full shot and you must keep your eyes open. Don't be a little sloppy.

With regard to how to learn the technology of driving a crane, Xiao Bian provided the above specific methods for everyone, hoping to have a reference for our friends who study the crane. In fact, if you want to learn the real crane technology, we need to work hard and hard work in order to learn.


Pre-insulated Pipe Fabrication

Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.

All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling


Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine

WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.pipefusionwelding.com