1. Comprehensive management of equipment accidents, regardless of the cause, regardless of the size of the accident, including failures.
Second, the overall management of equipment accidents, not only the equipment management personnel to manage, but also the production operators must also manage, the violation of the command, the equipment, the management personnel have the right to stop the operation, the operator has the right to refuse.
Third, it is necessary to manage the whole process of the accident, organize accident repairs, conduct accident analysis, and formulate and supervise measures to prevent accidents. Propose the handling of accidents and submit them to relevant departments in a timely manner.
Fourth, the scope and classification of the accident.
Equipment that is officially put into production, in the production process, causing damage to equipment parts and components, causing sudden interruption of production, or sudden interruption of production due to the direct interruption of energy supply due to the equipment of the enterprise is called equipment accident.
1. Major equipment accidents, equipment accident loss (equipment repair cost plus production loss) of 50,000 yuan or more, or equipment repair cost of equipment accidents of more than 15,000 yuan; or major production equipment accidents make production The system is shut down for more than 16 hours.
2, general equipment accidents, equipment accident loss costs of more than 5,000 yuan, less than 50,000 yuan; or equipment repair costs of more than 1,000 yuan less than 15,000 yuan, or major production equipment equipment accidents caused production The system is shut down for more than 4 hours and less than 16 hours.
3, small equipment accidents, those who are insufficient for general equipment accidents are small equipment accidents.
4 equipment failure: In the production process, the equipment is not working properly, and the control failure is called equipment failure.
5. Any equipment accident must be reported to the Mobilization Department as required. After a major equipment accident, it must be reported to the Mobilization Department within two hours. The general accident must be reported to the Mobility Department (within 24 hours) after the equipment is restored. . Small equipment accidents and equipment failures report downtime to the Mobility Department before the 24th of each month.
6. The equipment is interrupted and the production is interrupted. It is usually interrupted once.
Accident time:
1. The time between the shutdown of the equipment and the recovery of production capacity of the equipment.
2. The equipment with the standby unit in the design, the time when the accident equipment is stopped and the standby equipment is turned on.
Equipment accident loss:
Including equipment repair and production loss. The repair fee includes replacement of materials, spare parts, labor and management fees. Loss of production loss = unit product profit * hour plan production * affect production time.
7. Those responsible for equipment accidents shall be punished according to their responsibilities.

To meet the needs of supplying cooled or heated air to living or working tents or camps used for various events, Tentcool gives the best solutions by Event Tent Air Conditioner products. 

The event tent air conditioner can be used for wedding tents, Birthday Party Tents, Disaster Relief Tents, Worker Camps, etc. No need to consider the weather condition again. Unique design enables cooling or heating in minutes after the air conditioning units are set in place. 

Features:

Event Tent Air Conditioner

  • Mobile Compact Design
  • Powerful Cooling or Heating
  • Wide applications
  • Low Noise
  • High Temperature Durable
  • Easy Installation

Certification:

  • ISO9001
  • ISO14001
  • CE Certified. 


Spare parts warranty of 24 months

After sales services and maintenance on demand.



Technical Data:

Model No. TTAC-07HCWa TTAC-07HCWa TTAC-12HCWaS TTAC-12HCWaS TTAC-18HCWaS TTAC-18HCWaS TTAC-40HCWaS TTAC-70HCWaS
Type Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal Horizontal
Cooling capacity kW 7.00 7.00 12.00 12.00 18.00 18.00 40.00 70.00
Heating capacity  kW 7.70 7.70 13.50 13.50 19.50 19.50 45.00 77.00
Electric Heating kW 3.00 3.00 4.00 4.00 6.00 6.00 8.00 15.00
Rated cooling power input W 2550 2550 4150 4150 7000 7000 17500 30200
Rated heating power input W 2650 2650 4450 4450 8500 8500 18500 31400
Rated cooling current input A 12.2A 12.2A 7A 7A 11.7A 11.7A 29.5A 51.1A
Rated heating current input A 12.7A 12.7A 7.5A 7.5A 13.2A 13.2A 31.2A 53.0A
Evaporating side airflow m3h 1000 1000 2000 2000 3000 3000 5500 5500
Condensing side airflow m3h 3500 3500 5000 5000 10000 10000 22000 22000
Air pressure Pa 200 200 200 200 200 200 200 200
Compressor MFG GMCC GMCC PANASONIC PANASONIC PANASONIC PANASONIC PANASONIC PANASONIC
Evaporating side Noise dB(A) ≤40   ≤40   ≤45   ≤45   ≤48   ≤48   ≤52   ≤52  
Condensing side Noise dB(A) ≤55   ≤55   ≤60   ≤60   ≤65   ≤65   ≤70   ≤72
Net Weight kg 110 125 180 200 250 260 380 780
Dimension  (L x W x H))  mm 1150×710×820 740*620*1120  1280×930×1000 835*735*1275 1400×1080×980 930*850*1380 2100*1100*1210 2800*2100*1210



Event Tent Air Conditioner

Event Tent Air Conditioner, Wedding Tent Air Conditioner, Relief Tent Air Conditioner, Emergency Mobile Air Conditioning, Disaster Saving Portable Air Conditioner, Disaster Relief Tent air conditioner

Taizhou Tentcool Electrical Appliance Co., Ltd. , https://www.tentcool.com