For the use of sanitation workers ' garbage trucks in Chusheng , before loading the garbage, when the no-load operation reaches 6 standard air pressures, hang up the power take-off device (bottom left of the steering wheel in the cab) and check whether any components are leaking or abnormal. Operate according to the position indicated by the operation sign.

  The concrete operation steps of Xiagong Chusheng Sanitation Garbage Truck are as follows:

  1, sanitation garbage truck is strictly prohibited to put into construction waste, so as not to damage the parts.

2. The pressure regulating device of the sanitation garbage truck hydraulic system is a pressure regulating bolt on the multi-way reversing valve. After the bolt is adjusted and locked by the school pressure, it shall not be arbitrarily moved in use. The user is not allowed to adjust the oil pressure.   

3. If any abnormal motion is found during the operation of the hydraulic system, stop the work immediately, analyze the cause, and troubleshoot the problem. Never apply pressure.

  4. The clutch pedal must be stepped on regardless of whether it is engaged or disengaged from the power take-off device. When the power take-off device and the multi-way reversing valve are in working state, garbage cannot enter the driving state.

5, for the sanitation garbage truck is to lift the box unloading models:

  When the car is under load, rapid landing is not allowed. Slow down should be controlled by maneuvering the shuttle valve.

  When lifting the car box due to oil change, cleaning, and overhaul, it is necessary to support the car struts to prevent accidental drop of the car.

  When lifting the tank, you should choose a flat, solid ground parking dump. The carriage should rise slowly with the discharge of the material to prevent the vehicle from tipping or lifting the vehicle.

  When dumping materials, lift the collection bin and then lift the lift box so as not to collect the corner of the tail of the collection bin. Similarly, after the material is dumped, the bin should be put down and the collection bin closed.

  6, cleaning sanitation vehicle must not be rushed into the water in the hydraulic tank. Always check the height of the hydraulic oil level. When the hydraulic oil is insufficient, fill it in time. No leakage of oil may occur in all oil line joints.

Rubber Hose Systems

Concrete Pump Rubber End Hose

Concrete Pump Rubber Hose is an available part used at the end of pipeline.There are 2 different types:Steel Wire Hose and Fabric Braid Hose,met we show you the deatail informations about rubber hose firstly.

1.Product Introduction

rubber hose rubber hose 1

Part No. Product Name Description Specification
1 Concrete Rubber Hose DN125/5'' *3M 4 Layers Steel Wire
2 Concrete Rubber Hose
DN125/5'' *4M
4 Layers Steel Wire
3 Concrete Rubber Hose
DN100/4'' *3M
4 Layers Steel Wire
4 Concrete Rubber Hose
DN100/4'' *4M
4 Layers Steel Wire

Part No.
Product Name
Description
Specification
1 Fabric Braid Hose 2'' 4 Layer Fabric
2 Fabric Braid Hose
2.5'' 4 Layer Fabric
3 Fabric Braid Hose
3'' 4 Layer Fabric
4 Fabric Braid Hose
4'' 6 Layer Fabric
5 Fabric Braid Hose
5'' 6 Layer Fabric
2.Company Introduction


Factory10 years experience,HBYM GROUP LIMITED is a manufacture trading company.

We are located in Hebei province. Our main business include concrete pump spare

parts, concrete pipe, concrete elbow and clamp. We supply spare parts for Putzmeister

Pump, Schwing Pump, Zoomlion Pump, CIFA Pump, Kyokuto Pump etc. Besides we

could also produce parts as customers` drawing.

We have professional working team, business team, technical team, service team.Our

annual sales about USD 5million.Our business market mainly in North America, Eastern

Europe, Africa, Mid East, Western Europe and Domestic Market.


20170412 103714Factory 1

Rubber Hose Systems,Flexible Rubber Hose,Concrete Rubber Hose,Dn125 Rubber Hose

HBYM GROUP Co,.LTD , https://www.hbympumpparts.com