Model NO.: HY-R176
Delivery: 15-30 Days
Specialty: OEM, ODM
Applied Area: Clutch, Breaker, Air Conditioner, Car Wheel
Sample: Free Sample If in Store
QC Equipment: Salt Spray Machine, Hardness Testor, Caliper
QC Control: Inspect 30mins in Production and Before Delivery
Brand: Hy
Service: Response in One Hour
Trademark: Hanyee Metal
Transport Package: Plastic Bag, Carton Package, Pallet Package
Specification: (Dia)8mm*(Length)10mm
Origin: Ningbo
Product Specifications: 
Standard DIN, BS, ANSI, JIS, GB and so on
Head Type Flat Head,Oval Head Roud Head , Countersunk Head, Round Cone Head and so on, as customer requires
Raw Material 1, Carbon Steel: C1008, C1010, C1022
2, Aluminum
3, Steel: 35K, 45K, 10B21
4, Iron
5, Stainless Steel: SS201, SS301, SS303, SS304, SS316, SS416, SS420
6, Brass:C36000, C37700, C38500, C27200, C28000....
7, Copper 
Surface finish Zinc Plated, Ni Plated, Brass Plated
Tin Plated, Black Plated, Copper Plated. 
Gold Plated, Salt fog test, 
Shank Diameter 1.5mm-18mm
Heat Treatment Heat treatment with the material, and heat treatment with the product
Manufactruing Process Wire Drawing, Cold Heading, Heat Treatment, Surface Plating, Packing
Certifications ISO9001,ROHS,SGS 
Sample Availability Samples are available.
MIQ We accept test orders of small quantity. 
Price terms  FOB, CIF, CFR, EXW, and other trade terms.
Payment terms  T/T, L/C, western union, paypal, etc.
Lead Time 7-30days, according to customer's order qty and detailed requirements
Packing 500-2000pieces in a Polybag, then into a carton box, finally into a pallet, or customized
Size of the caton box: 33CMX25CMX15CM 
Size of the Pallet: 100CMX80CMX15CM, 16 Pallets in one 20'Container 
Size of the Pallet: 85CMX75X15CM,18 Pallets in one 20'Container
Warranty Policy We confirm our qualities satisfy to 99.9%, and have 6-month quality warranty 
After Sales Service We will follow up the requst strictly for customers, and will help customers solve problems after sale. 
Main Customers Auto parts company, Clutch disc company, clutch button company
Electrical appliances company, furniture part company, contruction project company
hardware company, Fastener company and so on .

 



2017 EXHIBITION WE ARE GOING TO ATTENT (BOOKED):

OCT.18-19  LAS VEGAS  National Industrial Fastener & Mill Supply Expo 2017
OCT.24-26  PANAMA     F EXPO 


 RFQ 
Q: Can I get some samples?
A: yes, Sample Orders welcome.
 
Q: Have RIVET 100% assembled well in stock?
A: Some of standard size is in stock. Consult online or by email is highly appreciated. And OEM service will be supplied.
 
Q: Could I use my own LOGO or design on goods?
A: yes, Customized logo and design on mass production are available.
 
Q: Can I choose the colors?
A:Yes, Customized color is available.
 
Q: What is the delivery time?
A: A week for samples; 15-30days for mass production. It is usually according to the quantity and items.
 
Q: What is the payment term?
A: T/T, L/C at sight, Western Union, Paypal, trade assurance, etc.
 
Q: Can I trust you?
A: Absolutely yes, we are "alibaba" verified supplier.
 
Q: May I visit your factory?
A: Sure, welcome anytime. We also can pick you up on airport and station.


Flush-Mount Special Finish Rivet with Heavy Washer

 

cooling mold Chiller

The chiller is a cooling water equipment that can provide constant temperature, constant flow and constant pressure. The industrial water chiller can always output ice water that is lower than the ambient temperature. It can be used wherever cooling is needed, either directly or indirectly. The chiller can be used to cool the injection mold and improve the quality of plastic products; Vacuum coating cooling, control the temperature of vacuum coating machine; Food industry cooling, rapid cooling processing; Chemical industry, effectively control the temperature of chemicals; Building cooling, rapid cooling and condensation of concrete, etc. Water chillers are widely used.



Water chillers can be divided into industrial water chiller, screw water chiller, electroplating water chiller, oxidation water chiller, laser water chiller, coating water chiller, wave soldering water chiller, reflow soldering water chiller, exposure machine water chiller, developer water chiller, ultrasonic water chiller, extruder water chiller, high-frequency quenching water chiller, Injection Molding Machine water chiller, electrophoresis paint water chiller Pharmaceutical special water chiller, food special water chiller, stainless steel water chiller, circuit board water chiller, plastic suction machine special water chiller, chemical water chiller, coating water chiller. According to working conditions, it can also be divided into air-cooled water chiller, water-cooled water chiller, low-temperature water chiller, thermostatic water chiller, etc



Energy saving function of water chiller:



The water chiller is a kind of refrigeration equipment that cools water and recycles it. The cooling water temperature can be adjusted automatically according to the requirements, almost without water consumption. Long-term use can save a lot of water. Therefore, compared with the mode of using tap water discharge to cool the equipment, the industrial water chiller is an ideal equipment that can quickly achieve the desired cooling effect and save energy.



About the function of the chiller, I will introduce it here today. Chillers play an important role in industrial production. Enterprises use chillers to improve production efficiency, ensure product quality and increase profits.



1. Regularly check whether the voltage and electric flow of the water-cooled chiller are stable, and whether the compressor operates normally. If it is a semi-closed compressor, regularly check the oil volume, which should be more than 2/3 of the window. When the water-cooled chiller works normally, the voltage is 380V and the current is within the range of 11A-15A.





2. Regularly check whether the refrigerant of the water-cooled water chiller has leakage: it can be determined by referring to the parameters displayed on the high and low pressure gauge on the front panel of the host. According to the temperature change of air temperature (winter and summer), the pressure display of the water chiller is also different. When the water chiller works normally, the high pressure display is 11-17kg, and the low pressure display is 3.5kg-5kg, which are normal.



3. Check whether the cooling water system of the water-cooled water chiller is normal, whether the fan and sprinkling shaft of the cooling water tower are in good operation, and whether the make-up water of the built-in water tank of the water-cooled water chiller is normal. The water-cooled chiller should be replaced with new water once every three months. If it cannot be replaced, please add rust remover.



4. All industrial water chillers should be cleaned once a year when they are used for six months. The main cleaning parts include cooling water tower, cooling water pipe and condenser to ensure better cooling effect.



5. When the water-cooled chiller is not used for a long time, the circuit switches such as the main power supply of the water pump, compressor and Cooling Tower should be turned off in time. The water-cooled water chiller needs to be connected with the cooling water tower and the circulating water pump to achieve the cooling effect. In order to ensure the quality of the circulating water, it can be considered to install a Y-type filter at the water source and add algaecide and scale remover to the cooling water tower to prevent impurities from entering the pipeline and affecting the operation of the unit.

Cooling Mold Chiller,Injection Molding Chiller,Chiller Used In Injection Molding,Cooling Mold Chiller

Ningbo Chenwei Machinery Technology Co.,Ltd , https://www.chenweimachinery.com