Double Shield TBM has two tunneling modes: single shield and double shield. It is suitable for hard rock and soft rock formations, and can realize the construction of complex long-buried tunnels with long depth in complex geomorphology, which is difficult to achieve with conventional drilling and blasting methods. This equipment can flexibly select different tunneling modes according to geological conditions and construction schedules to realize uninterrupted continuous excavation and will be used for the Lanzhou City Water Source Construction Project. The construction section is 24.4 km long and the maximum depth is 918 meters. It was shipped to the project site on the 15th.
“The design and development of the shield machine is at the headquarters. We are considering setting up a factory in Chengdu for manufacturing.†According to the relevant person in charge of the China Railway Group, the Chengdu Metro Line 18 is expected to use the shield machine independently developed by the China Railway Equipment Group. Matters are in negotiation. Previously, Chengdu Metro Co., Ltd. had disclosed that due to the high standards such as the speed of the 18th line, vehicles, shield machines, etc. need to be “tailor-madeâ€.
This article is China Engineering Machinery Business Network () original, if you need to reprint must be in the form of hyperlinks to indicate the source, is strictly prohibited from any changes in the original text.
Stainless Steel Redrawing Wire
Stainless Steel Redrawing Wire,High Tensile Strength Wire,Redrawing Wire Annealing Wire,Soft Bright Redrawing Wire
Jiangsu Manrui New Materials Co., Ltd , https://www.manruiwire.com