Connection Type: Welding
Name: PE Pipe Fittings
Application: to Connect PE Pipe
Connection: Hot Melting
Usage: for Cold Water
Purpose: for Water Transport System
Benift: No Harmful Elment
Brass Part: National Standard Brass with Zinc
Cut Methord: Use Scissor
Trademark: kangyu, or OEM
Transport Package: Carton
Specification: made by polypropylene and brass part
Origin: Liyi City, Shandong Province, China
HS Code: 391720000
Connection Type: Welding
Name: PE Pipe Fittings
Application: to Connect PE Pipe
Connection: Hot Melting
Usage: for Cold Water
Purpose: for Water Transport System
Benift: No Harmful Elment
Brass Part: National Standard Brass with Zinc
Cut Methord: Use Scissor
Trademark: kangyu, or OEM
Transport Package: Carton
Specification: made by polypropylene and brass part
Origin: Liyi City, Shandong Province, China
HS Code: 391720000
Product Description
Â
1, High Temperature Resistance
2, Heat insulation and Saving Energy
3, Corrosion Resistant
4, Lower Installation Costs
5, Higher Flow Capacity
6, Long Life
7, Recycled and Environment-friendly
2, Heat insulation and Saving Energy
3, Corrosion Resistant
4, Lower Installation Costs
5, Higher Flow Capacity
6, Long Life
7, Recycled and Environment-friendly
electrical fusion PE pipe fittings for waterÂ
Product Description
PE pipe electrical fittings list
Â
female lectrical  coupling | lectrical coupling | reduce lectrical coupling |  male lectrical  coupling |
lectrical tee | lectrical reduce tee |  |  |
90 lectrical elbow | elbow lectrical  reduce | lectrical male elbow | lectrical female elbow |
 |  |  |  |
factory overview
Product show
 RAW MATERIAL
PRODUCTION PROCESS
1.Measure and mark the depth or weld area of the pipe fitting (such as saddle pipe fitting) on the pipe with marker pen.
2.The oxide layer in the welding zone must be completely removed before welding.cleaning the pipe surface
3. The welding surfaces of pipes and fittings must be absolutely clean, dry and free from oil pollution.
4. Insert the welded end of the pipe into the limited shoulder or marking depth of the pipe fitting, and the pipe fitting must be installed together with the pipe without stress
5. Connect the welding machine plug to the pipe fitting jack, and accurately input the welding time and cooling time specified on the pipe fitting.Or scan the barcode directly to enter the welding parameters.
6, preparations were made, press the confirmation key, welding opportunity once again shows that welding parameter, completely confirmed, and then press start button to start the welding, the welding will automatically alarm prompt, after the end of the welding procedure.
CONTATCE US
EILEEN TENG
SHANDONG KANGYU PIPE INDUSTRIY CO.,LTD
JIAHZHAI INDURTARY PARK,LINYI CITY,SHANDONG PROVINCE ,CHINA
PHONE NO:0086 15168998025
Product Description
Â
1, High Temperature Resistance
2, Heat insulation and Saving Energy
3, Corrosion Resistant
4, Lower Installation Costs
5, Higher Flow Capacity
6, Long Life
7, Recycled and Environment-friendly
2, Heat insulation and Saving Energy
3, Corrosion Resistant
4, Lower Installation Costs
5, Higher Flow Capacity
6, Long Life
7, Recycled and Environment-friendly
electrical fusion PE pipe fittings for waterÂ
Product Description
PE pipe electrical fittings list
Â
female lectrical  coupling | lectrical coupling | reduce lectrical coupling |  male lectrical  coupling |
lectrical tee | lectrical reduce tee |  |  |
90 lectrical elbow | elbow lectrical  reduce | lectrical male elbow | lectrical female elbow |
 |  |  |  |
factory overview
Product show
 RAW MATERIAL
PRODUCTION PROCESS
1.Measure and mark the depth or weld area of the pipe fitting (such as saddle pipe fitting) on the pipe with marker pen.
2.The oxide layer in the welding zone must be completely removed before welding.cleaning the pipe surface
3. The welding surfaces of pipes and fittings must be absolutely clean, dry and free from oil pollution.
4. Insert the welded end of the pipe into the limited shoulder or marking depth of the pipe fitting, and the pipe fitting must be installed together with the pipe without stress
5. Connect the welding machine plug to the pipe fitting jack, and accurately input the welding time and cooling time specified on the pipe fitting.Or scan the barcode directly to enter the welding parameters.
6, preparations were made, press the confirmation key, welding opportunity once again shows that welding parameter, completely confirmed, and then press start button to start the welding, the welding will automatically alarm prompt, after the end of the welding procedure.
CONTATCE US
EILEEN TENG
SHANDONG KANGYU PIPE INDUSTRIY CO.,LTD
JIAHZHAI INDURTARY PARK,LINYI CITY,SHANDONG PROVINCE ,CHINA
PHONE NO:0086 15168998025
Full Closed Cabin Scooter,Full Colosed Tricycle,Full Closed Scooter,Cabin Scooter
YUMBOMOBILITY LTD , https://www.yumbomobility.com