1. First select the conveyor belt route for feeding. There are 3 feeders in this workshop. You can choose 3 feeders to transport different varieties into 3 big balls at the same time. Therefore, the squad leader must pre-require the big ball to be fed. Arrange the next step early. Under normal circumstances, the ball miller can continue to enter the ball according to the original variety according to the ball record table of the quality inspection room without further notice.

2. The milling station shall use forklift shovel fed into the feeder time of the first ball and the ball iron plate cover open, large ball will fall into the hopper mouth, a preliminary check by the estimated position stapling feed water does not flow out of the ball Then push the spherical conveyor belt to the appropriate position, pull the required chemical material according to the regulations and put it on the place where the ball mouth does not hinder the operation, then adjust the water volume of the water tank to prepare the opening and feeding.

3. Before opening the belt, check the conveyor belt surface or the belt for any foreign objects or objects that are not safe. Follow the conveyor belt number, press the switch, start the conveyor belt, and then check whether the conveyor belt is deflected and found the conveyor belt. When you are biased, you should use the Tolu to adjust the belt. After the adjustment, you should turn off the belt and quickly find the follow-up machine. It is strictly forbidden to scrape the sand in the active and passive wheels by hand or sand shovel for safety.

4. After the conveyor belt is finished, start feeding, open the drain valve, and use the water to flush the mud and other materials into the ball until all the raw materials have entered the ball. During the feeding, the ball mouth is not allowed to leave the person. Out, the muddy sand falling along the conveyor belt should be shoveled back into the ball. After the sand mud is finished, all the chemical materials of the ball joint are put into the big ball and then washed with water to clean the falling hopper. The conveyor belt is shut down and pushed open. The spherical activity belt, the hopper is lifted by the crane and placed, and all the ball covers and the ball plate of the big ball are covered to prepare for the kick-off.

5. If you can't put the sand into the material at the same time, you need to stop the feeding, stop the water, and lift the hopper. If you need to start the big ball for operation, please refer to the " Ball Mill Operating Regulations".

6. The water entering the ball must be well controlled. It is required to open small when the material is first fed, and then increase the amount. Otherwise, the phenomenon that the water will be discharged after the sandstone mud is not filled may cause difficulty in the feeding of the back.

7. Every day, the ball mill squad leader must go to the quality inspection room to inquire about the water data, update the ball mill's water volume record blackboard data, and make the class notice.

8. Due to the arrangement of the workshop, the ball is transferred to another variety. When the ball mill needs to be cleaned, the ball mill personnel should refer to the “Ball Mill Cleaning Operation Specifications”.

9. Ensure that the cleanliness of the place where it is needed on duty is in accordance with the requirements of the workshop, and the cleaning tools are stored at the designated location.

10. Pay attention to safety. When working on the spherical surface, fasten the seat belt and fasten the safety hook to reduce the accident.

Industrial Sewing Machine

"Sewing" Creations..
Advanced sewing system makes "sewing" almost perfect.
MYSEW's new digital sewing system inherits traditional experience and intuition, and digital settings present the best sewing conditions anytime and anywhere.

fully automatic industrial sewing machine

Ningbo World Wide Electric techonology CO.,Ltd , https://www.nbmy-sewmachine.com