Following information is essential for your better understanding on our moulds
Name: Description
Products' infomation we need to make quotation: Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material: 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base: LKM, HASCO ect.
Cavity: Single/multi
Runner: Hot/cold
Mould Design: 3D/2D Drawing
Design Days: 3 days
Design Software: UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material: PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life: 300, 000-3, 000, 000 shots
Injection System: Pin-point-gate
Polish System: Mirror Polish
Payment: 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time: 15-60days
Specification: Depends on customers requirements.
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
 ↓ ↓ ↓ | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement |
According to the classification of forging process, closed die forging and open die forging are commonly used. Closed die forging generally keeps the gap between the upper die and the lower die during the forging process, and the material is formed in the closed die cavity around it. Generally, no flash is generated. A small amount of excess material will form longitudinal flying spurs, and the flying spurs can be removed in subsequent steps. Closed die forging improves the dimensional accuracy and surface quality of the product, reduces flash, and improves the utilization of materials.
SCZY mainly produces hot forging products, both closed die forging and open die forging are produced, which can depend on the requirements of the product. Whether it is closed die forging or open die forging, we will fully consider it during mold development to reduce the occurrence of defective products in the production process. Our own internal mold manufacturing, forging production and subsequent secondary CNC machining can cooperate with each other, which can better ensure product quality and production delivery.
Closed Die Forging Parts,Carbon Steel Closed Die Forging Parts,Closed Die Hot Forging Part,Steel Die Forging Parts,Closed Die forging
Shenzhen SCZY Technology Co.,Ltd , https://www.szsczycasting.com