If you look at the selection of investment plans, please pay attention to the following questions:
1. The details of this equipment and the estimated budget are for reference only and cannot be used as the basis for the final investment. Therefore, China Mineral Processing Technology Network will not bear any losses caused by customers building factories according to this schedule.
2. The final selection design should be based on the feasible process test report, combined with the needs of the investor and the actual situation on the site, and can be implemented after professional design personnel design and strict technical argumentation.
3. The price of equipment in this list will fluctuate normally according to market conditions, and some equipment models can also be replaced reasonably under appropriate circumstances.
4. If you have any questions, please ask.
1. The details of this equipment and the estimated budget are for reference only and cannot be used as the basis for the final investment. Therefore, China Mineral Processing Technology Network will not bear any losses caused by customers building factories according to this schedule.
2. The final selection design should be based on the feasible process test report, combined with the needs of the investor and the actual situation on the site, and can be implemented after professional design personnel design and strict technical argumentation.
3. The price of equipment in this list will fluctuate normally according to market conditions, and some equipment models can also be replaced reasonably under appropriate circumstances.
4. If you have any questions, please ask.
70-100 tons / day copper plant equipment list
Equipment category | model | name | Quantity |
First, the crushing equipment | 600×500 | Trough feeder | One |
PEF250×400 | Compound pendulum jaw crusher | One | |
PYB-600 | Standard cone crusher | One | |
SZZ 2 900×1800 (25 mm upper mesh, 15 mm lower) | Self-centering vibrating screen | One | |
B=500 mm L=15-20 m angle=17°-18° | Tape conveyor | Two sets | |
MW1-6 | Magnetic iron hanging down | One | |
Chain chain hoist | 2 sets | ||
B=500 | Metal detector | One | |
Second, grinding classification equipment | ¢800 | Disc feeder | 2 sets |
1200×2400 | Wet lattice ball mill | One | |
FLG-750 | Sorghum spiral classifier | One | |
B=500 mm lk=5.5, L=5.5~7 m | Tape conveyor | One | |
Third, lifting equipment | Manual single beam crane | 5 tons | |
Fourth, flotation equipment | ¢1000×1000 | Stirring tank | One |
XJK-0.35 | Flotation machine 8 slots | 2 sets | |
5. Dehydration equipment (with daily processing of copper concentrate below 4.5 tons) | 1500×1500 | Inclined plate thick box | One |
2 m 2 | Fan filter | One | |
SZ-2 | Water ring vacuum pump | One | |
0.2 m 3 | Automatic water discharge filtrate cylinder | One | |
0.5 tons | Taiwan scale | One | |
(3 m × 1.3 × 10 yards m) 39 m 3. | Sedimentation tank natural precipitation | 4 | |
six | 300 tons | Weighbridge | One |
OBSH-75GE is a specific type of Foaming Agent used in the production of cellular rubber and plastic materials, particularly in the field of foam rubber. It is designed to facilitate the expansion of rubber and plastic compounds during the vulcanization or foaming process.
Foaming Agent,OBSH Foaming Agent,Chemical Foaming Agents,Best Foaming Agent,Foaming Agent Price
GuangDong DuBa New Material Technology Co.,LTD , https://www.gddubachem.com