June 1 from Sinopec Baling Petrochemical caprolactam business department was informed that the monthly output of this division in May exceeded 20,000 tons for the first time, reaching 20033 tons, caprolactam liquid quality superior grade rate reached 100%.
In order to tap the limit production capacity of caprolactam combined plants and provide reliable process data for subsequent transformation, the division launched a high-yield competition in May and expanded the logistics channels of caprolactam products through commissioned processing. At the same time, for the phenomenon of serious fouling in the caprolactam plant and in the crystallization reactor, a fine maintenance mode was introduced, which effectively prolonged the life cycle of the reactor.
Wire Mesh,Metal Mesh,Steel Mesh,Chicken Wire Mesh
HEBEI KANGLIDA METALNET CO.,LTD. , https://www.kldwovenwiremesh.com